![]() |
![]() |
|
|
22-08-2006 Second European model under construction. |
||
| The construction of this
large European model is well on it's way. The order was issued on the
14 of July, and has a promised lead time of 15 working days. In the
pictures about half of the model is visible. This 1:200 project is located in Den Haag and consists of 3 full residential building blocks by two different architects. AMOD will build only the actual buildings on the site. The floorplate will be created in Holland. |
||
|
|
|
|